- Part of BW upgrade project from 3.1 to 7.3.
- Regression testing of all the BW extractor,error handling and bug fixes.
- Reconciliation of all the BW reports with R3 data.
- Requirement Analysis and preparing High Level Design (HLD) document, User Requirement Specification (URS) document,Effort Estimation.
- Conducting Client sessions for Requirement Gathering and recommending BW Reporting level changes
- Understanding the current landscape and advising Client on how they can consolidate all their existing Reports from different IT systems into SAP BI Reporting
- Recommending BW data flows in order to replace existing non-SAP applications across the entire IT landscape and integrating it into a single uniform system
- Handling High priority tickets, CRs and other deliverables
- Participated in Knowledge Transfer sessions before the shadow support and prepared the play back session ppts given to the client.
- Debugging highly complex ABAP routines.
- Responsible for Data load scheduling(Daily/weekly/monthly) as well as load monitoring,process chain optimization.
- Analysed the reasons for frequent load failures and fixing the errors and make sure that data is available for reporting.
- Providing support for BW related activities in R/3 system.
- Interacting with the customer in getting requirements and providing value addition solutions if required.
- Preparing and participating weekly and Monthly Status meeting with the customer.
- Participation and providing inputs in the Pre and Post planning round meetings.
- Monitoring regular process chain and sending status to the user.
- Have given Knowledge Transfer on system landscape and data flow from different interfaces present in the system to the new joiners to the project.
- Creating DSO,Cubes & Open Hub's.
- Documentation related to Logistics
- Testing routines.
- Creating Process chains.
- Loading and monitoring data in Production system.
- Checking and Monitoring Performance of Queries.
- Go-live Cut over activities
menu bar
Sunday, 6 April 2014
Implementation project Activities for SAP BI/BW
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment